Designed for fitness and wellbeing app teams building guidance and habit flows.
Routine feedback must be readable at a glance. Separate a helpful timer or completion cue from instructional movement that requires expert review.
What we can build
- Routine and interval feedback.
- Habit milestone motion.
- Rest and completion states.
The final deliverables are agreed during discovery. Source files, implementation support and additional platform variants are included only when explicitly scoped.
A clear control contract
Plan the animation’s public controls before producing a full motion library. A starting specification might include:
- phase: work / rest / complete.
- remaining: application timer.
- milestone: confirmed achievement.
These are proposed control names and behaviors, not an existing Rive asset. The final file determines the actual property and state names.
Integration considerations
Use the product clock as the timing source; animation loops must not measure elapsed workout time. Exercise technique or medical guidance needs qualified review.
Review the behavior
Background and resume the app during an interval. Check the displayed phase still follows the application timer rather than the animation clock.
From brief to handoff
- Define. Review your audience, key events, platform and asset requirements.
- Design. Approve the visual direction, key poses and transition rules.
- Build. Rig the artwork and author the agreed state system.
- Validate. Review an export against the acceptance sequence and target runtime.
- Handoff. Deliver the scoped assets, control map and integration notes.
Questions before we start
Can you animate exercise technique?
Illustrative movement may be scoped with expert-approved reference. This service does not provide medical or exercise prescriptions.
What should I include in the brief?
Share the target platform, screen dimensions, existing artwork, desired states and any runtime restrictions. A short recording of the current product is useful.
How are timing and cost agreed?
Scope depends on the artwork, state count, platform validation and revision needs. A defined brief comes before a project estimate.