Designed for design system teams maintaining interactive product icons.
A collection of unrelated animated icons feels inconsistent. Define stroke behavior, timing, optical alignment and start/end poses across the set.
What we can build
- Motion rules for an icon family.
- Loop and one-shot variants.
- Static pose exports.
The final deliverables are agreed during discovery. Source files, implementation support and additional platform variants are included only when explicitly scoped.
A clear control contract
Plan the animation’s public controls before producing a full motion library. A starting specification might include:
- active: toggled state.
- progress: bounded fill where appropriate.
- play: one-shot action.
These are proposed control names and behaviors, not an existing Rive asset. The final file determines the actual property and state names.
Integration considerations
Simple SVG/CSS icons can remain code-native. Use Rive when shared animation logic or more complex transitions justify a runtime.
Review the behavior
Review at actual icon sizes and on low-density displays. Check that static silhouettes remain legible without playback.
From brief to handoff
- Define. Review your audience, key events, platform and asset requirements.
- Design. Approve the visual direction, key poses and transition rules.
- Build. Rig the artwork and author the agreed state system.
- Validate. Review an export against the acceptance sequence and target runtime.
- Handoff. Deliver the scoped assets, control map and integration notes.
Questions before we start
Can existing icons be used?
Yes, after a consistency and licensing review. Editable vector source helps preserve alignment and stroke quality.
What should I include in the brief?
Share the target platform, screen dimensions, existing artwork, desired states and any runtime restrictions. A short recording of the current product is useful.
How are timing and cost agreed?
Scope depends on the artwork, state count, platform validation and revision needs. A defined brief comes before a project estimate.